Friday, December 15, 2017

201712112 CBHS

O3 analyzer was shut down @ 10:50
New Daqfactory  ctl clearbrook_20171212.ctl.  If ozone is reinstalled use old clearbrook_20140709.ctl
Teflon filter was not replaced and will ned to be if instrument turned back on.

No comments:

Post a Comment

20191018 Site Visit

Shut down instrument at 11:39 cdt Checked leak outside; needs to be resealed